
EarthQuant
1. Project Details
Solar Project/ SPV details.
2. Location Details
Geographical Details
3. Plant Specifications
Physical assumptions or Photovoltaic Properties.
16.50%
79.69%
4. Commercial Terms
Parametric contract assumptions.
It represents the trigger level of energy generation below which downside impacts are evaluated.
The minimum level of energy generation assumed in the downside scenario, below which additional shortfalls are not included for analysis.
5. Modelling Settings
Dataset, detrending, and annual window selection.
1
1
Loss Curve Engineering · Blow Controls
Configure blow-point logic and loss curve behavior.
IrradianceIQ
Built for insurance professionals: Translate solar irradiance uncertainty into clear risk metrics for |